BRU CO. Logo
Our Services

Four disciplines,one roof.

Comprehensive construction solutions under one roof, from foundation to finish, BRU delivers with precision and excellence.

01
Structural & Construction Works
02
Architectural Works
03
Electromechanical Works
04
Interior Design & Finishing

Every service is backed by our ISO certifications in Quality, Safety, and Environmental Management, ensuring every project meets the highest international standards.

Service 01

Structural & Construction Works

Establishing and building projects to the highest specifications and structural standards. Full concrete and steel execution, from excavation and foundation setting through the reinforced-concrete frame to a completed structural shell.

  • Excavation & earthworks to the founding level in the soil report
  • Plate load testing & soil bearing verification
  • Reinforced raft foundations & isolated footings
  • Column necks, columns, tie beams & suspended slabs
  • Backfilling in 30 cm compacted layers to code
  • Structural steel & concrete execution
Service 02

Architectural Works

Designing and executing architectural structures with precision, from concept to built reality, merging form with function. Our architects work alongside the site teams so the drawing and the building never drift apart.

  • Concept & schematic architectural design
  • Design & build delivery
  • Façade design and execution
  • Contemporary, neoclassical, semi-classic and Andalusian/Islamic idioms
  • Compliance with the approved architectural plan on site
  • Room, bathroom and kitchen setting-out per plan
Service 03

Electromechanical Works

Implementing advanced mechanical, electrical and plumbing (MEP) systems: heating, ventilation and air conditioning (HVAC), water supply, drainage and power distribution, with top-tier quality and compliance. Sanitary extensions are executed strictly per the sanitary drawings, covering water supply systems and their maintenance, sewage, and air-conditioning and heating drainage.

  • Sanitary extensions per approved sanitary drawings
  • Water supply systems & maintenance
  • Sewage and drainage systems
  • Air-conditioning and heating drainage
  • Power distribution & electrical installations
  • HVAC systems
Service 04

Interior & Finishing Works

High-quality interior and exterior finishes with meticulous detail, plus full interior design implementation. The finishing stage consists of several precise steps that begin with preparatory works and end with handing over the project ready for use.

  • Full interior design implementation
  • Interior and exterior finishing
  • Façade works
  • Joinery, wooden elements & façade lighting
  • Material quality control & adherence to the approved design
  • Continuous supervision to harmonise all trades
0
Structural stages with sign-off
0%
Minimum compaction per layer
0cm
Maximum backfill layer thickness
0×
Anti-termite treatment passes
Inspection Process

Checked, then checked again.

Quality assurance at BRU is written into the method statement itself, each of the 21 structural stages carries its own verification, and supervision re-inspects after every formwork strike.

  • 01

    Soil & Founding Level

    Founding level taken from the soil report; plate load test confirms bearing capacity and permissible settlement are within safe design limits.

  • 02

    Fill Classification

    Backfill sample classified by test, graded coarse granular fill, ideally type (a-1-a), and placed in 30 cm layers to code.

  • 03

    Compaction Verification

    95% compaction confirmed for every layer to prevent settlement cracking the ground-floor blinding and dropping the floor tiling.

  • 04

    Formwork Inspection

    Timber formwork must be new; strengthened with tie rods, clamps and sound bracing to prevent failure during casting.

  • 05

    Plumb & Alignment

    Columns plumbed on all sides before casting, then re-inspected after the formwork is struck.

  • 06

    Casting Control

    Required concrete strength enforced, moulds thoroughly wetted before pouring, vibrator used throughout the pour.

  • 07

    Setting-Out Compliance

    Structural drawing followed for setting-out, column dimensions and column heights; rooms, bathrooms and kitchens squared per the architectural plan.

  • 08

    Waterproofing

    Tie beams insulated to stop moisture migrating into ground-floor walls and causing paint to peel.

SOIL & FOUNDING LEVELSTRUCTURAL FRAMEENVELOPE & MEPHANDOVER
Compliance

Standards, in full.

  • Full compliance with all regulatory, quality, and professional standards required in the Saudi construction industry
  • Member of the Saudi Contractors Authority
  • Formally classified by regulatory bodies for structural, architectural, and MEP works
  • All engineers hold verified professional qualifications and active memberships with relevant bodies
  • Compliant with Saudi nationalization (Saudization) requirements
Certifications

ISO certification in quality, safety and environmental management, membership of the Saudi Contractors Authority, and formal classification for structural, architectural and MEP works.

Let's Build Together.

Your vision,our craft.

Building Reference United Company · EST. 2000 · ISO CERTIFIED · JEDDAH, KSA